Manual isometric takeoff has long been a standard part of industrial construction estimating. When an RFP arrives, estimators review the isometric drawings, identify components, calculate quantities and organize that information before building the estimate.

The process works, but it also requires a considerable amount of skilled time. As drawing packages become larger, the cost of completing takeoffs manually becomes more than a question of labour. It can also affect how much work an estimating team has the capacity to pursue.

The Time Behind a Manual Isometric Takeoff

Consider an RFP containing 300 isometric drawings. If each drawing takes approximately 20 minutes to review and complete manually, the takeoff alone represents about 100 hours of estimator time.

300
isometric drawings
100 hrs
of estimator time
$10,000
for a single bid
$200,000
across 20 bids a year

Illustrative, based on 20 minutes per drawing and a $100/hour loaded labour rate.

Using an illustrative loaded labour rate of $100 per hour, that would represent approximately $10,000 in skilled labour for a single bid. For a team completing 20 similarly sized bids in a year, the same calculation would amount to $200,000 in estimator time.

Actual costs will vary depending on drawing complexity, labour rates and project scope. However, manual processing can take approximately 15–30 minutes per isometric drawing, which makes large drawing packages a significant demand on estimating resources.

Manual Takeoff Also Creates a Capacity Challenge

The direct labour cost tells only part of the story. The same estimator completing a manual piping takeoff could otherwise be reviewing scope, identifying project risks or evaluating another opportunity.

This becomes particularly important when several RFPs need to be completed at the same time. An estimating team has a finite number of hours available, and a large drawing package can consume a substantial portion of that capacity.

This challenge is further compounded by ongoing skilled labour shortages in the construction industry.

As a result, some bid/no-bid decisions may be influenced by whether the team has enough bandwidth to complete the required takeoff within the deadline.

The financial impact of that constraint is harder to calculate because an opportunity that was never pursued will not appear as a direct expense.

Automating Isometric Takeoff

Automation in construction offers another way to approach this part of the estimating process.

NRX ISO Takeoff is designed to extract quantities from isometric PDF drawings, including:

  • Pipe
  • Fittings
  • Valves
  • Flanges
  • Supports
  • Welds
  • Insulation
  • Tracing

The extracted information is provided as a populated takeoff that can work with an estimating team's existing Excel workflow, without requiring a 3D model.

This allows repetitive extraction work to be completed more efficiently while keeping experienced estimators involved in the parts of the process that require their knowledge and judgment.

Looking Beyond the Cost Per Bid

When evaluating a manual isometric takeoff process, labour cost is an important metric, but it should not be the only one. Estimating teams should also consider how many hours are spent on takeoffs, how that workload affects bid capacity and whether limited bandwidth has prevented the company from evaluating additional opportunities.

For industrial contractors regularly working with large piping drawing packages, improving the takeoff process can ultimately be as much about creating estimating capacity as reducing costs.

Create More Capacity for Your Estimating Team

Discover how NRX ISO Takeoff can help streamline material takeoffs, reduce manual effort and give estimators more time to focus on building competitive bids.

Request a Demo

Share this article

FacebooktwitterredditpinterestlinkedinmailFacebooktwitterredditpinterestlinkedinmail